Gave English and Spanish monthly Safety Classes.
Shut down production in order to fix a palletizer, althoug production stopped in the long run all three shift ran without having two people fixing the placement of the product, which took about 25 minutes.
On the third shift also supervised the controls personnel and the maintenance department, along with all 40 line production personnel.